Halloween Forum banner

1 - 3 of 3 Posts

·
Grand Poobah
Joined
·
2,899 Posts
Discussion Starter #1
I didn't do anything new last year due to moving...

I have 3 bimba cylinders, 2 solenoid valves, 1 sprinkler valve, a timer, a PIR sensor, a kajillion lights from pin spots to strobes to string lights....

Any ideas? I was going to improve my MIB with more animation last year, but didn't expect to move. No time for that now, but maybe time to make something simple.
 

·
Keeper of Spider Hill
Joined
·
1,782 Posts
how long of throw cylinders do you have to work with ? could always do a pop up barrel or trashcan. That can easily be done in 2 days. you could always pick up one of those remote control christmas outlets for about $10 to control it.:rolleyes:

I've built 2 full sized barrels , I've been wanting to do one of the smaller metal garbage cans.
 
1 - 3 of 3 Posts
Top