Joined
·
5,479 Posts
Dixie, I want to do the same thing. Need to get started. How thick is each layer you are doing?Right now, i have 4 going at a time, and that means it will only take me about 5 to 6 nights of putting one layer of mache on each, and letting them dry overnight, and I will have 4 pumpkins by the weekend.