I just move my tombstones like 2 feet forward or backward every 4-5 days. I'm not sure how big of a footprint yours are but mine are made from 2 inch foam so they are fairly narrow. I use the same rebar method you describe so it's not a big deal to pull the rebar, and bang it in somewhere else. You just need to give that stressed grass some sunlight again.
I have some with a larger footprint (upside down styro cooler as a base) that I put in a natural area.
I have some with a larger footprint (upside down styro cooler as a base) that I put in a natural area.