Made some progress on our crypt entrance today, with Lord Nevermore getting the walls completed and put into position for a test-fit. The next step is to put the hardware on to hold it all together, then we can start on the roof and the architectural features like trim, moldings, and columns. Final work will be texturing the exterior walls (interior will be canvas covered with scenesetters, since it'll be dark inside). IMG_20140726_134529.jpg
IMG_20140726_134554.jpg
The ToTs will enter through the front and exit the broken wall on the right to go up to the front door for candy. The garage door will be open (but blocked off) to show the crypt with the mummified corpses and the tomb.
 