So who else is running way way behind? My wife and I said "naw we won't add much this year."yeah that worked out well. 35 foot of new added cemetery fence, 3 ghost, 6 new tombstones A coffin Lid, and a compete resurfacing of the crypts later I am hoping to finish up this weekend!
but we are at about 85% so I think it' now the home stretch. Here's a pic of the newest Stone and the crypts and if you want to see more it's over on Flickr
PS hi everybody long time no see!
Thread: Olde Oaks getting ready
-
Olde Oaks getting ready –
10-25-2011,03:48 PM
-
Wild Fandango
- Join Date
- Oct 2010
- Posts
- 1,358
10-26-2011,10:21 AM
I'm so far behind I'm not going to get much more done than I had last year. The big party I go to every year is this weekend (I really wish it wasn't always the weekend before/weekend of Halloween
) Oh well. I need to stop being a procrastinator.
-
10-26-2011,10:40 AM
I wanted to start prep and planning in June but hubby said he didn't want to even think about fall that early. Now he is wishing he had listened. Although I guess he gets to be free of the last minute consequences. He works all week until the weekend so it is my job to get all the big stuff out of the way. I still need to finish painting the mausoleum and the cemetery pillars, corpse two more pumpkins, make 2 fog chillers and god knows how many other things.. I know I'll make it to the finish line although someone may have to drag my broken battered body across it.
When Hallows Eve draws close once more
And terror rides the wind
The Ravenfells shall waken
And stalk their lands again.
-
10-27-2011,01:13 PM
My Sis in Law and her beau decided to have a Halloween party this year, trouble is they didn't have any decorations. they came over last week for a quick tutorial in haunting and left with some scrap ply-wood and a loaned saber saw and two of my corpses. the sabre saw and corpses should be back Sunday but I feel better that they are further behind than me! one of these days i will look up what "Procrastinate" means.



LinkBack URL
About LinkBacks
Olde Oaks getting ready


yeah that worked out well. 35 foot of new added cemetery fence, 3 ghost, 6 new tombstones A coffin Lid, and a compete resurfacing of the crypts later I am hoping to finish up this weekend! 


Bookmarks